Detailed Image Description
This image shows a labeled floor plan of a library’s main level, outlining closures and access points during summer 2025 renovations. At the top left, the North Entrance (marked "A") remains closed. The South/West Entrance (marked "B") near the bottom left will be closed from May 12 through August 11. Nearby, the Tunnel to the Science Building (marked "C") remains open. Two staircases (marked "D") next to the South/West Entrance are also closed during this period. A Service Elevator (marked "E") located at the top right stays open. Contractor access (marked "F") is indicated at the far right side near another stairwell. The layout includes labeled rooms, stacks of shelving, a circulation lobby, a reference desk, classrooms, restrooms, and elevators. Directional arrows point toward "The Woods" and "The Science Building." A text box in the top left summarizes the meaning of each marker (A–F) to aid navigation during construction.