Aug
20
2024
Pedestrian access into Harden Hall is limited during the Fall 2024 semester due to increased construction associated with the Harden Renovation project.
Building Entrances
- From Tracy Avenue (east entrance) and parking lot 11, enter Harden Hall directly on the first floor. The sidewalk from the parking lot is ADA accessible.
- From The Science Building (TSB), follow the tunnel under the construction zone to Harden Hall. The tunnel is ADA accessible.
- Enter tunnel from the first floor of The Science Building near TSB 1707 and the elevator.
- Enter tunnel from the first floor of Harden Hall near the Archives.
- From the Jamrich Hall (JXJ) - Harden Hall connector, enter the Harden Hall vestibule. Stairs are required to access the first floor of Harden from this entrance. There is no elevator access from the JXJ connector entrance to the first floor of Harden Hall.
Walkways
- The JXJ-Harden connector can be accessed from Jamrich Hall or the connector’s side entrances.
- A walkway is open alongside the construction zone in the Academic Mall.
- The walkway from Lot 28 to the JXJ-Harden connector is open.
Parking
- The nearest ADA accessible parking is available in Lot 11.